Company Info:

IT Infrastructure:

RLC upgraded our information technology infrastructure to better serve customers' needs for design, development, and continued support. Our information technology is no less important than manufacturing or production. Data is more critical today than ever! RLC upgraded and modernized our IT system to provide increased security, efficiency and data redundancy in all areas. Below are some interesting specifics and facts about our information technology systems.


Infrastructure:

  • Three production servers - 1 Virtual
  • 5 Dell 6224P 24-port gigabit POE managed switches
  • 18 desktop work stations
  • 7 mobile work stations
  • Custom built phone server with 32 Polycom IP phones
  • 70" Sharp Aquos monitor for teleconferencing and multimedia
  • Spare hardware for all critical server/client systems and network


Servers:

  • Poweredge R520 Server:
  • Dual Xeon E5-2420 Processors
  • 16GB 1333Mhz RDIMM RAM (4GB x 4)
  • Microsoft SBS 2011 Standard with 25 CALs
  • PERC H310 RAID Controller
  • Qty 4: 500GB SATA 7200RPM Hard Drives on RAID 5
  • Dual Redundant Hot-Plug power Supplies
  • Windows Small Business Server 2011 includes Microsoft Exchange 2010
  • Poweredge R510 Server:
  • Dual Xeon E5649 Processor
  • 16 GB 1333 MHz RDIMM RAM (8GB x 2)
  • PERC H700 RAID Controller
  • Qty 4: 500GB SATA 7200RPM Hard Drives on RAID 5
  • Dual Redundant Hot-Plug power Supplies
  • Windows Server 2012 / Windows Server 2003 (Virtual)
  • Overland Storage SnapServer DX1
  • 4 1TB SATA drives in Dynamic RAID
  • 2x Gigabit Ethernet with load-balancing
  • Supports SMB, CIFS, NFS, AFP, HTTP, FTP
  • Installed Applications
  • Exchange 2003
  • Edition
  • Infor VISUAL Manufacturing MRP
  • Office 2003/2010
  • 99.9% uptime since upgrade in September 2007
  • APC Smart UPS 2200 UPS Battery System on all servers with network auto-shutdown
  • Symantec Anti-Virus Corporate Edition


Backups:

  • Nightly data backups of critical server systems
  • Weekly data backups of client systems
  • Four redundant data backup drives used in weekly rotation
  • Two redundant image backup drives used in quarterly rotation
  • Two large redundant backup drives, 1 in-house, 1 off-site
  • Fully documented, tested, and challenged Disaster Recovery Plan
  • Server bare-metal recovery in 1-4 hours
  • Client bare-metal recovery in 4-12 hours
  • Non-critical systems recovery in 12-48 hours